SBM – J-lay System

Conceptual Design and Engineering of pipe handling equipment and J-lay tower.

The J-lay system is capable of installing SCRs, offloading lines and tendons in various water depths.

  • customer
    SBM
  • project name
    J-lay System
  • location
    World Wide
  • water depth
    Up to 3000 meters (9,842.52 feet)
  • year
    2006 - 2008

See Other GMC Projects