Pacific Energy – Eureka

Structural analysis of existing platform. Design of all pipe handling equipment, modifications to the platform and installation of the 7″ liner.

Project initiated to restore production from the Eureka platform by pulling a 7” liner through an existing 12” line.

  • customer
    Pacific Energy
  • project name
    Eureka
  • location
    Long Beach, California
  • water depth
    75 – 230 meters (246.06 – 754.59 feet)
  • year
    2007 - 2008