Engineering & Project Management for pipeline replacement project.
Installation analysis of 4.6km of 12” flexible pipe offshore UAE. The line was initiated via…
Installation analysis of 4km of 10” flexible pipe offshore UAE. The line was initiated via…
Detailed design for the Tubular Bells DC-09 manifold and suction pile foundation in 4600 feet…
Pipelay operation management and training. GMC provided offshore consultants on the Lan Jiang Laybarge, including…
Provide consulting during the construction and operation of the purpose built lay barge Nebula. GMC…
GMC provided senior consultancy services to manage the integration and commissioning of the subsea infrastructure…