OPI – Afren WFB/EBOK
Installation analysis, installation aid design, and procedure development for one jacket, one topside, two 8”…
Detailed design for the Tubular Bells DC-09 manifold and suction pile foundation in 4600 feet of water. The manifold is a dual header production manifold, 4-slot/8-hub, complete with valves, hubs, pressure caps and controls-related equipment.