NPCC – Zirku Field Development

Installation analysis of 4.6km of 12” flexible pipe offshore UAE.  The line was initiated via a beach pull and terminated through a J-tube pull-in in 18m of water.

  • customer
    NPCC
  • project name
    Zirku Field Development
  • location
    Russia
  • water depth
    14 meters (45.93 feet)
  • year
    2012

See Other GMC Projects