NPCC – Umlulu Field Development

Installation analysis of 4km of 10” flexible pipe offshore UAE.  The line was initiated via a DMA and terminated through a J-tube pull-in in 22m of water.  The initiation end was then pulled up through a J-tube as well.

  • customer
    NPCC
  • project name
    Umlulu Field Development
  • location
    Persian Gulf
  • water depth
    22 meters (72.18 feet)
  • year
    2013

See Other GMC Projects