Supervision and execution of the control module refurbishment, development of function test and operational testing programs, through to offshore installation and start up.

Developed the procedures to fully test a set of refurbished subsea control modules, managed the construction and testing of the completed systems. Developed the detailed test and acceptance procedures to prove the integrity of the system, and write the offshore installation and startup procedures. Completed the project by managing the offshore installation and start up of the full system through to customer hand off.

  • customer
    ERT
  • project name
    Subsea Production Control System
  • location
    Gulf of Mexico
  • water depth
    1,280.16 meters (4200 feet)
  • year
    2010 - 2011