ENI – Appaloosa Subsea Pig Launcher

Engineering design, manufacture, project management and installation of a subsea pig launcher.

Phase 1: To Design a Pig that would launch utilizing a low flow rate.

Phase 2: Design, Manufacture and carry out the testing of the Pig.

Phase 3: To Design, Manufacture and SIT a Subsea Pig Launcher based on the initial test results.

  • customer
    ENI
  • project name
    Appaloosa Subsea Pig Launcher
  • location
    Gulf Of Mexico
  • water depth
    1280 meters (4,199.48 feet)
  • year
    2009 - 2011

See Other GMC Projects