Deepwater pipeline procedure development for COOEC. A full set of general deep water, 1000m to 3000m, installation procedures were developed.
Installation analysis, procedure drawings, and design of all installation aids for a series of 8”,…
Installation analysis, installation aid design, and procedure development for one jacket, one topside, two 8”…
The full design of two replacement pipelines connecting a wellhead platform in 15m of water…
Perform offshore pipeline lateral stability analysis and create pipeline alignment sheet and trench profile. Work…
Pipelay operation management and training. GMC provided offshore consultants on the Lan Jiang Laybarge, including…
Consulting and installation services for the installation of subsea PLEMs, PLETs, SCRs, and jumper installations….