GMC’s ‘Connected Pipe Deepwater Deployment System’.
GMC Deepwater Lowering System, has been designed for installation of subsea modules, the system uses GMC’s patented, ISO certified and proven high fatigue connectors to provide a strong and reliable method of interconnecting tubulars for deploying the hardware to the seabed. The system can be used for safely lowering modules such as PLET’s, PLEM’s, Manifolds and heavy subsea hardware from any crane barge or vessel of opportunity in deep water hostile environments.
The system offers fast deployment, using high fatigue, quick connect snaplay connections. Once in position the subsea module is parked and the deployment system is recovered to surface and ready for the next deployment. Reducing installation time and cost, and enabling large heavy modules to be lowered safely in a controlled manner in deep water applications. The rigid deployment system is less effected by resonance than traditional installation methods.
For further details please contact
[email protected]