View Larger
image not found

Afren – OKORO

The full design of two replacement pipelines connecting a wellhead platform in 15m of water…

View Larger
image not found

OPI – Shell FYIP

Installation analysis, procedure drawings, and design of all installation aids for a series of 8”,…

View Larger
OPI- Afren WFB-EBOK-10_tn

OPI – Afren WFB/EBOK

Installation analysis, installation aid design, and procedure development for one jacket, one topside, two 8”…

View Larger
NPCC- Zirku 7_tn

NPCC – Zirku Field Development

Installation analysis of 4.6km of 12” flexible pipe offshore UAE.  The line was initiated via…

View Larger
2013 NPCC- Umlulu Field Dev 1_tn

NPCC – Umlulu Field Development

Installation analysis of 4km of 10” flexible pipe offshore UAE.  The line was initiated via…

View Larger
2012-2013 NRG-1_tn

NRG/HESS – Tubular Bells

Detailed design for the Tubular Bells DC-09 manifold and suction pile foundation in 4600 feet…

View Larger
2011 Technip- HYSY201 3_tn

TECHNIP – HYSY 201

Pipeline installation criteria development, wet pipelay evaluation, wet buckle contingency analysis, and procedure development for…

View Larger
HYSY201--CHUAN-7_tn

COOEC – HYSY 201

Deepwater pipeline procedure development for COOEC.  A full set of general deep water, 1000m to…

View Larger
image not found

NJSC Chornomornaftogaz – GMC Pride Modular Pipelay Barge

The ‘GMC PRIDE’ is a modular pipelay barge designed for the cost effective and efficient…

View Larger
project_engineering-pac-energy-eureka_tn

Pacific Energy – Eureka

Structural analysis of existing platform. Design of all pipe handling equipment, modifications to the platform…

View Larger
project_engineering-pac_elly-eureka_tn

Pacific Energy – Elly-Eureka

Engineering & Project Management for pipeline replacement project. Integral part of customer’s PMT in support…

View Larger
project_engineering-petrobras_tn

Petrobras – Cascade Chinook

GMC provided senior consultancy services to manage the integration and commissioning of the subsea infrastructure…