GMC North Sea Caisson Install in the News!

August 24, 2016 Industry Press, News

GMC has made big waves in the press with the recent installation of connected caissons in the North Sea:

GMC installs seawater caissons in North Sea – World Oil
www.worldoil.com/news/2016/8/12/gmc-installs-seawater-caissons-in-northsea
12 Aug 2016 – READING, United Kingdom — GMC Limited has announced the successful installation of a seawater caisson in the North Sea; eight days …

GMC delivers North Sea caisson – Offshore
www.offshore-mag.com/articles/2016/08/gmc-delivers-northsea-caisson.html
12 Aug 2016 – GMC has completed its first installation of a seawater caisson in the North Sea. … Next Article | Prosafe rigs on hire in North Sea, Brazil …

GMC Wraps Up Seawater Caisson Installation in North Sea | Subsea …
subseaworldnews.com/2016/…/gmc-wraps-up-seawater-caisson-installation-in-norths
12 Aug 2016 – This is the first installation that has been carried out by the company in the North Sea; with a further two fabricated caissons completed and …

GMC Installs Seawater Caissons In North Sea – Oil Guru
oilguru.org › North Sea
15 Aug 2016 – GMC Limited has announced the successful installation of a seawater caisson in the North Sea; eight days ahead of schedule.

GMC makes a splash in the North Sea with … – All About Shipping
www.allaboutshipping.co.uk/…/gmc-makes-a-splash-in-the-northsea-with-connected-
11 Aug 2016 – GMC Limited is proud to announce the safe and successful installation of a seawater caisson in the North Sea; eight days ahead of schedule.

GMC in North Sea seawater caisson first
OE Digital-15 Aug 2016
GMC has successfully installed a seawater caisson in the North Sea; eight days ahead of schedule. It is the first installation carried out by the company in the …

GMC delivers North Sea caisson
Offshore Oil and Gas Magazine – ‎Aug 12, 2016‎
READING, UK – GMC has completed its first installation of a seawater caisson in the North Sea. Two more fabricated caissons are due to follow later. The TSA-coated 30-in. OD diameter structure was installed in nine sections using eight sets of GMC’s